Projects
>
Sustainable and Renewable Energy Projects
Sustainable and Renewable Energy Projects
Biomass
Wind
Waste Energy
Land fill Gas
Solar
Biomass
Ontario, Canada
- 50 MW waste wood fired IPP plant – detailed design, cost estimating, economic and technical feasibility study, fuel studies and project development.
California, USA
- 80 MW waste wood IPP plant – economic modeling and acquisition due diligence.
Ontario, Canada
- 15 MW waste wood CHP plant – preliminary design and evaluation of economic and technical feasibility.
Brazil
- 35 MW cashew nut hull fired IPP plant – preliminary design, fuel sourcing, modeling and proposal preparation.
Brazil
- 65 MW bagasse (sugar cane waste) CHP plant for sugar processing facility - preliminary design and evaluation of economic and technical feasibility.
Quebec, Canada
-120 MW waste wood IPP plant – preparation of proposal to sell power from existing plant, negotiation of power wheeling agreements through three utilities, economic modeling and negotiation of proposal with power purchaser.
British Columbia, Canada
- 17 MW waste wood fired IPP plant – detailed due diligence including economic modeling, evaluation of all contracts, documents, fuel sourcing and O&M.
New Brunswick, Canada
- 20 MW waste wood IPP plant – inspection and evaluation of plant equipment and economic modeling of an existing but shutdown plant for possible investment and re-start.
Nova Scotia
-140 MW bio-fuel (switch grass) fired CHP plant – detailed evaluation, cost estimating, preliminary design, and economic and technical feasibility study.
Wind
Pennsylvania, New York and Massachusetts, USA
- 120 to 500 MW windfarm projects – greenfield windfarm development of multiple sites including site identification, land negotiations and preliminary development
California, USA
- 110 MW windfarm – acquisition due diligence of existing windfarm including contract review and economic modeling
British Columbia, Canada
- 100 MW windfarm projects – market analysis including identification of primary wind plant development areas and developers
Prince Edward Island, Canada
- 150 MW windfarm – initial evaluation of site suitability and economic evaluation
Pennsylvania, USA
- 170 MW windfarm - initial evaluation of site suitability, including transmission interconnection
Waste Energy
North Carolina, USA
- 25 MW steam turbine based plant utilizing 1,200 – 2,000 Deg F waste heat – complete design of plant including all engineering, cost estimating and economic modeling
Tennessee, USA
- 280 kW Organic Rankine Cycle plant utilizing waste heat from steel manufacturing – successful preparation of capital cost grant application.
Arizona, USA
- 800 kW Organic Rankine Cycle plant utilizing waste heat from thermal oxidizer in electric arc furnace electrode manufacturing plant – successful preparation of capital cost grant application
Oklahoma, USA
- 480 kW Organic Rankine Cycle plant utilizing waste heat from soil decontamination thermal oxidizer – detailed economic and technical evaluation
West Virginia, USA
- 220 kW Organic Rankine Cycle plant utilizing waste heat from soil decontamination thermal oxidizer – successful preparation of capital cost grant application
New Hampshire, USA
– 20.8 MW electric arc furnace heat recovery and steam turbine – preliminary design, equipment selection, and detail technical and economic evaluation
Landfill Gas
Alberta, Canada
- 80 MW landfill gas and natural gas IPP peaking plant – preliminary plant design, cost estimating, economic and technical modeling and proposal preparation
Ontario, Canada
- 5 to 25 MW existing landfill gas to pipeline gas plants – acquisition due diligence
New York, USA
- 50 MW landfill gas CHP plant with greenhouse host – initial project identification, evaluation of project technical and economic viability
Kansas, USA
- 20 to 20 MW plants (30 total) – identification of markets and power purchasers, proposal preparation and negotiation with power purchasers
Ontario, Canada
- two 25MW IPP plants – purchaser identification and negotiation of Power Purchase Agreements
Rhode Island, USA
- Preliminary design, economic evaluation and proposal preparation for a 3.5 MW cogeneration plant at existing landfill
Nevada, USA
- 8 and 12 MW IPP plants – electrical interconnection design
Solar
Kuwait, Middle East
- major infrastructure development project - preliminary analysis and review of Concentrating Solar Power (CSP) and Very Large Scale Photovoltaic (VLS-PV) options, costs, advantages and disadvantages for energy supply and desalination
News links
GE to Present Technology Solutions for Creating a Sustainable Future in the Sugar and Ethanol Industry
German solar pioneer Wagner Solar Inc. targets North America with award-winning products
Fortum to partner in one of Europe’s biggest onshore wind farm projects with 40% holding